Buckeye Technologies Inc. today announced that its Foley Plant in Perry, Florida, which manufactures specialty wood cellulose and fluff pulp, is returning to normal operation following a power failure and electrical surge that occurred last Friday, February 17. The power failure was triggered by a malfunction in a high voltage electrical line and subsequent transformer failure in its power house. This resulted in the unplanned, complete shutdown of the facility. Power has been fully restored to the facility, and one of the plant’s two production lines resumed operation at normal rates on Sunday. Company officials are targeting for the second line to resume normal operation on Wednesday, February 22.
Buckeye Chairman and CEO John B. Crowe said, "While this is an unfortunate event, I appreciate the efforts of our employees and contractors with a rapid and around the clock effort to return the plant to normal operations. Resources have performed in a safe manner to identify the damaged equipment and make the necessary repairs. We are working with all of our customers and anticipate no major customer issues from this event. The Foley Plant remains in a sold out position and we believe current inventory levels are adequate to cover the production losses for the near term. Our highest priority is to safely return the plant to full operation.”